Overland Administrative Building Update

Below are some of our recent updates and pictures about the Overland Administrative Building! If you are interested in doing volunteer work and you are a skilled tradesman please feel free to contact Dulce Gaede at 314-881-3218. There is still […]

Below are some of our recent updates and pictures about the Overland Administrative Building!

If you are interested in doing volunteer work and you are a skilled tradesman please feel free to contact Dulce Gaede at 314-881-3218. There is still much work to be done with carpentry, painting, and windows etc.

September 10 – Ken Hill our flooring volunteer is shown here repairing carpet in our administration wing. Ken has been a real blessing to our work here in Overland.

Flooring

 

 

August 19 – We would like to give a special thanks to GMP Plumbing for their gracious help at the Overland building. Without the help of such faithful Christians our outreach efforts to the community would not be possible.

This concludes our plumbing work for the entire building.

Plumbing 3 Plumbing 2 Plumbing 1

 

August 14 – Mike and William have done an excellent job repairing masonry walls shown here on the Woodson road side of the building.

Painting of the outside trim is also now complete and looks great!

Masonry 3Masonry 2Masonry 1

 

July 31 – Mike Humphrys is removing stairs and decking from the southeast set of fire stairs for sandblasting and painting.

We would like to give special thanks to Dave with Abrasive Sandblasting Inc. For donating time and materials to this project.

One down and one to go. The bottom right picture is the finished product on the southwest side of the building.

Stairs 1 Stairs 2 Stairs 3 Stairs 4